A grid of 10 ft squares made from 1" EMT conduit, clamped together with Maker Pipe connectors and covered in reflective tarps, is the shade many Burning Man and festival camps build themselves. Here’s how one goes together, with the exact counts the CampShade planner uses.
The frame is a grid of 10 ft squares. Every pole and every rail is one uncut 10 ft stick of 1" EMT conduit, the thin-wall steel tube electricians run wire through. Maker Pipe connectors clamp the sticks together at the top of each pole with bolts and a single 5 mm hex key, and a flange connector holds each pole’s foot. Reflective tarps bungee onto the rails.
That modularity is the point: the same parts build a 20×20 for a few friends or a 40×40 for a whole camp, and they pack flat for next year.
How the grid goes together
Poles stand at every grid point and rails run along every grid line at the top. Which connector a pole needs depends only on how many rails meet there.
- 90° corner
- 4-way (edge)
- 5-way (inside)
- Ratchet strap to its anchor
A 30×30 frame from above. Straps run from the top of a pole out to a ground anchor.
- 90° corner at the four outside corners, where two rails meet.
- 4-way along the edges, where three rails meet.
- 5-way inside the grid, where four rails meet.
- Flange under every pole, pinned to the ground.
Maker Pipe’s connectors are made to fit 3/4" or 1" EMT. The planner uses 1": it’s stiffer over a 10 ft span, and a 10 ft stick weighs about 6.7 lb.
Counting parts for any rectangle
For a layout R squares deep and C squares wide:
| Poles | (R + 1) × (C + 1) |
|---|---|
| Rails | R × (C + 1) + C × (R + 1) |
| 10 ft EMT sticks | poles + rails |
| 90° corners | 4 |
| 4-way connectors | 2 × (R − 1) + 2 × (C − 1) |
| 5-way connectors | (R − 1) × (C − 1) |
| Flanges | one per pole |
| 8" spike nails | 4 per corner pole, 3 per other pole |
A 30×30 is 3 squares by 3: 16 poles and 24 rails make 40 sticks, with 4 corner, 8 four-way and 4 five-way connectors, 16 flanges and 52 nails. Anchors, straps, tarps and bungees follow their own rules; the parts lists by size have every line.
| Size | Poles | Rails | EMT sticks | Connectors | Build time |
|---|---|---|---|---|---|
| 20×20 ft | 9 | 12 | 21 | 9 | about 4 hours |
| 30×20 ft | 12 | 17 | 29 | 12 | about 5 hours |
| 30×30 ft | 16 | 24 | 40 | 16 | about 6 hours |
| 40×30 ft | 20 | 31 | 51 | 20 | about 8 hours |
| 40×40 ft | 25 | 40 | 65 | 25 | about 10 hours |
Build time is the planner’s rough estimate, which grows with the number of squares.
Tools
- Drill and a 3/8" bit long enough for the pilot holes
- Impact driver and a 3/4" socket for the lag bolts
- 5 mm hex key for every Maker Pipe bolt (a hex bit in the driver is faster)
- 25 ft tape measure and spray paint or stakes to lay out the grid
- 4 ft level to check poles before final-tightening
- 6 ft step ladder for rails and tarps on 10 ft poles
- Pipe cutter or hacksaw, only if you cut poles to 8 ft
- Work gloves: cut EMT edges are sharp
Build order
- Mark the site
Mark the footprint with spray paint or stakes: a pole mark at every 10 ft grid point (16 on a 30×30) and an anchor mark 5–7 ft out from each corner and every 20 ft along the edges.
- Set the base flanges
One flange connector on every pole mark. Pin each plate with 8" spike nails before any strap goes on: 4 at the corner poles, 3 at the rest. On pavement, where nothing can be nailed, set a 50 lb sandbag on each plate once its pole is up.
- Drive the strap anchors
On playa or hard dirt, drill a 3/8" pilot hole and drive a 1/2" × 18" lag bolt with an impact driver. In grass, screw in a 15" auger anchor. Which anchor for which ground.
- Stand the poles
Corner poles first, each in its flange, then the rest.
- Connect the rails
Perimeter first, then the interior. Leave the connector bolts snug, check the poles with a level, then final-tighten every bolt once the frame is plumb.
- Strap it down
One ratchet strap from each anchored pole’s top fitting to its own anchor. Hook around the fitting, never to a bolt, and put a half-twist in each strap so it doesn’t hum. Walk the perimeter to even the tension.
- Hang the tarps
Bungee each tarp to the rails through its grommets. A 30×30 takes one 20×20, two 10×20 and one 10×10 tarps, and the planner counts 94 ball bungees for them.
- Every morning
Re-tension the straps. Drop tarps and wall panels when a Wind Advisory is issued or the forecast reaches sustained 31+ mph or gusts 46+ mph, whichever comes first. Don’t wait for a High Wind Warning.
Lower sections
Every square can be 10 ft or 8 ft tall. An 8 ft pole is a 10 ft stick cut down, and the planner notes how many to cut. Squares that share a tarp need the same height, so a mixed layout usually takes more, smaller tarps. Where an 8 ft square meets a 10 ft one, the shared poles carry rails at two heights; check those poles, since they can need a second connector the parts list doesn’t count.
Teardown
- Drop the wall panels and tarps before any strap comes off. Never loosen a frame that still has fabric on it.
- Back the lag bolts out with the impact driver, pull the flange spikes, and sweep each anchor point for washers and nail heads.
- Line-sweep the footprint plus 10 ft for anything left on the ground.
- Count poles and fittings against the parts list as you pack.